About This Project

Towards the end of 2016, HCT Floors was approached by FDC Construction & Fitout Pty Ltd to undertake the timber flooring works for the new Hermes Flagship Store at Sydney International Airport. This was not your ordinary job.

This was not a standard Brushbox timber floor. Challenges were faced at every detail, from the set out through to installation and on to the Sand & Polish. Not only was the timber installed in a “picture frame” pattern, but our board lines and mitre joints had to meet the apexes of the joinery, the ceiling recesses and the main door way….everything was in lines and built in 90mm increments. Tolerances were below 1mm!

If that wasn’t enough, the Client wanted their logo….the Hermes Logo formally known as the ‘Ex-Libris’…inserted in the floor. The timber floor at the entrance was machined out to allow for the insertion of a 3mm Stainless Steel Ex-Libris. At the turn of the new year, the project was complete.

Project Snapshot

Builder:

FDC Construction & Fitout Pty Ltd

Architect:

RDAI Architects (Paris)

Location:

Sydney International Airport, Sydney

Completed:

March 2017

Products:

90 x 19 T & G Solid Timber Flooring

Species:

Brushbox Select Grade